Data Center Infrastructure
eigenForge builds and deploys purpose-built data centers from 2 to 5 MW. Factory-built, rapidly deployed, and engineered for AI and high-performance compute. 10 sites currently under contract.
10
Sites Under Contract
2–5
MW Per Site
<12
Months to Energize
Infrastructure
Each site is engineered for 2 to 5 megawatts of IT load. Right-sized for fast deployment without the overhead of hyperscale builds.
Factory-built and pre-commissioned. Sites arrive ready to energize — cutting months off traditional data center timelines.
Designed to deploy wherever power is available. Brownfield, greenfield, or co-located with existing substations and generation assets.
Integrated power distribution, cooling, and fire suppression in a single integrated envelope. Connect to medium voltage and go.
Start with one site. Add more as demand grows. Each facility operates independently while sharing site-level infrastructure.
High-density rack configurations supporting GPU clusters and high-performance compute workloads from day one.
Pipeline
We are actively evaluating locations across the U.S. for new deployments. If you have power availability, land, or site infrastructure — we want to hear from you. Reach out to discuss power claiming and site partnerships.
Get in TouchReach out to discuss site partnerships, power availability, and new deployments. We're actively onboarding new sites.